Caldere HEPP is located in south-west region of Turkey, city of Mugla Dalaman district, on Cal creek, which flow into regions main water flow Dalaman creek. 
Çaldere HEPP project conducted under the Electricity Market Law No. 4628.
The plant was built in a very short period of time (19 months). It was taken into operation in April 2008.
The plant with an installed capacity of 8.9 MW, 2.4 m3/sec project flow rate and 430 m head produces annualy about 40,000,000 kWh of energy.
Electromechanical equipment has been supplied by the consortium Areva-Vatech Bouvier - Lorey Somer.